Removal
Asbestos Removal Asbestos Removal Contractors Asbestos Removal Specialist Asbestos Demolition Asbestos Encapsulation
Roofing
Asbestos Roof Removal Asbestos Roof Sheet Removal Asbestos Garage Roof Removal Asbestos Roof Replacement Asbestos Gutter Removal
Interior & Cladding
Asbestos Ceiling Removal Asbestos Cladding Removal
Testing & Inspection
Asbestos Testing Asbestos Inspection CPD Accredited Asbestos Surveyor
Disposal
Asbestos Disposal Asbestos Waste Removal
Property Services
Residential Asbestos Removal Commercial Asbestos Removal Industrial Asbestos Removal
Areas – East Rand
East Rand Overview Alberton Bedfordview Benoni Boksburg Edenvale Germiston Kempton Park Springs
Areas – Sandton & Surrounds
Sandton Bryanston Illovo Morningside Rivonia Sunninghill Woodmead
Areas – West & South-West
Ferndale Krugersdorp Randburg Roodepoort Soweto Weltevredenpark
Areas – Fourways & Midrand
Fourways Honeydew Kyalami Midrand North Riding
Areas – Rosebank & Inner North
Houghton Hyde Park Melville Northcliff Rosebank
Company
About Reviews Contact

Asbestos Removal Fourways

Get the best quote, fast
5-Star Reviewed
Home › Fourways

Asbestos Removal Fourways — compare quotes from registered asbestos contractors covering Fourways and surrounds. Roof sheeting, ceilings, gutters, cladding, testing and disposal.

Much of Fourways is still being built out of old plots: smallholdings and 1980s houses in Craigavon, Witkoppen and Chartwell are bought, demolished and replaced with clusters. Before any of that, asbestos has to come out first.

Your street, what the material is and roughly how much of it there is.

Get Fourways Quotes

Which Fourways Properties Have It

WhereEraUsual finding
Chartwell and Craigavon smallholdings1970s – 1980sOutbuilding roofs, staff quarters, sheds
Witkoppen and older plots1970s – 1980sGarage roofs, gutters, soffits, boundary panels
Lonehill and Douglasdale houses1980s – early 1990sGarage and carport roofs, flues, ceilings in additions
Magaliessig and early clustersLate 1980s – 1990sOccasional gutters; often none
Dainfern and post-2000 estates1990s – presentNone

A plot sold for redevelopment typically carries a house, staff quarters and two or three outbuildings, each needing to be on the survey.

Demolish In The Right Order

  • The survey comes before the bulldozer. Demolishing a structure with asbestos still in it turns a contained strip into contaminated rubble across the whole plot.
  • Rubble contamination is expensive. Mixed asbestos and building waste all goes to the hazardous facility, at hazardous rates and weights.
  • Developers need the paperwork. A disposal certificate and clearance are what lets the demolition contractor start on a clean site.

If a plot has already been partly demolished, stop and get an inspection before any more rubble is moved.

Sequence For A Clean Site

On a redevelopment the cheapest order is always survey, strip, clear, then demolish. The surveyor lists every suspect material on every building, a registered contractor removes it under a plan of work, an approved inspection authority clears the site, and only then does the demolition crew arrive. Skipping the survey to save a few thousand rand risks paying hazardous disposal on tonnes of rubble rather than a few hundred square metres of sheeting. Build the sequence into the development programme so the demolition date is not held up.

Fourways Cost Guide

JobIndicative rangeNotes
Removal and disposal, per square metreR185 – R430/m²Houses and outbuildings
Minimum jobR6,500 – R12,000Mobilisation, notification, disposal run
Pre-demolition survey, single plotR5,000 – R12,000All structures on the stand
Single garage roof, ~20m²R7,500 – R16,000Common outbuilding find
House roof, 120–150m²R28,000 – R65,000Strip before demolition
Staff quarters roof and ceilingsR15,000 – R40,000Interior work priced separately
Clearance and air monitoringR3,000 – R8,000Approved inspection authority

Indicative ranges, not quotations. They are benchmarked against the metro averages on Asbestos Removal Johannesburg and adjusted for local access and the disposal haul. Condition, access and how much is done in one visit move the number more than the suburb does.

Get everything on the property priced in one visit rather than one item at a time.

Compare Fourways Quotes

Frequently Asked Questions

Do I need an asbestos survey before demolishing in Fourways?

Yes, for any structure built before the mid-1990s. Removal has to happen before demolition, not during it.

What happens if the house was demolished with asbestos in it?

The rubble is treated as contaminated, which usually costs far more to dispose of than the original sheeting.

Does a Dainfern home need checking?

Rarely. Post-2000 estates almost never contain asbestos, though a test is cheap if something looks suspect.

How long does the strip add to a development programme?

Typically one to three weeks including notification, removal and clearance, longer for plots with many outbuildings.

Related Services

Asbestos Removal Johannesburg is a free quote-matching service. The asbestos work is carried out by the independent registered contractors that quote you, and your contract is with the contractor you appoint. Ask each contractor for their registration and insurance details before appointing anyone.

Describe the job once and compare quotes from LEADERR APPROVED asbestos contractors covering your area.

Get 5 Quotes

Get Asbestos Removal Quotes in Fourways

Tell us your street and what needs removing, for quotes from registered contractors covering Fourways.

Free to use, no obligation. Your request goes to LEADERR APPROVED asbestos contractors covering your area, who quote you directly.